Five stages that take you from first contact to a running GRB2 880.264 line in your facility — covering audit, design, FAT testing, and operator training.
A technical conversation about raw material, target throughput, and installation conditions. If the investment is to qualify for white certificates, an energy audit is planned at this stage as well.
Selection of the GRB2 880.264 variant, configuration of ancillary machines, and preparation of a detailed technical and commercial offer.
Machine build at the factory in Żnin and Factory Acceptance Test (FAT) before dispatch — with the option for the customer to attend.
Transport to the customer's facility, line installation by Nawrocki engineers, and operator training covering operation and basic diagnostics of the GRB2 880.264.
36-month warranty and an optional ServicePlus package with scheduled maintenance and service support in your EU country.